Case Studies / Energy Efficiency

India’s largest premium mall operator upgraded cooling at its flagship Mumbai mall with an off-balance-sheet chiller lease - unlocking ₹20 Cr+ in lifetime savings

India’s largest premium mall operator upgraded cooling at its flagship Mumbai mall with an off-balance-sheet chiller lease - unlocking ₹20 Cr+ in lifetime savings
Project Impact
₹20 Cr+ lifetime savings

driven by improved energy efficiency

~30% better efficiency guaranteed

saving on annual energy spend

3,400+ passenger cars taken off the road for a year

carbon abatement equivalency

Tier-1 global chiller OEM

reliability and long-term performance assurance

The Case
Major extension planned at the flagship Mumbai mall

requiring a substantial step-up in cooling capacity

Existing infrastructure fell short

inadequate for the expanded load and long-term efficiency targets

Client needed an off-balance-sheet, low-overhead structure

predictable outcomes and an operating partner befitting a marquee mall

The Solution
Asset

Advanced water-cooled chillers with best-in-class auxiliary infrastructure from a Tier 1 OEM

Financing

Tailored operational lease with guaranteed performance outcome.

Support

Detailed technical and site assessment, and OEM partnership for reliability and long-term efficiency

Have a clean infrastructure project in mind?

We’ll help you finance and build with guaranteed savings

Contact Us